{"id":32213,"date":"2020-02-10T18:12:49","date_gmt":"2020-02-10T18:12:49","guid":{"rendered":"http:\/\/e-ratepaorg.local\/?p=32213"},"modified":"2020-02-17T18:20:06","modified_gmt":"2020-02-17T18:20:06","slug":"bulk-upload-tool-guide-for-internal-connections-frns-2","status":"publish","type":"post","link":"https:\/\/e-ratepa.org\/?p=32213","title":{"rendered":"Bulk Upload Tool Guide for Internal Connections FRNs"},"content":{"rendered":"<p><span style=\"color: #222222;\">February 10, 2020<\/span><\/p>\n<p>Attached:\u00a0<a href=\"https:\/\/e-ratepa.org\/wp-content\/uploads\/2020\/02\/Bulk-Upload-Guide-Internal-Connections-FY-2020.pdf\" class=\"mtli_attachment mtli_pdf\" target=\"_blank\">Bulk Upload Guide &#8211; Internal Connections &#8211; FY 2020<\/a><\/p>\n<p>Attached:\u00a0<a href=\"https:\/\/e-ratepa.org\/wp-content\/uploads\/2020\/02\/C2-IC-Bulk-Upload-Template.xlsm\" target=\"_blank\">C2 IC Bulk Upload Template<\/a><\/p>\n<p>Attached:\u00a0<a href=\"https:\/\/e-ratepa.org\/wp-content\/uploads\/2020\/02\/IC-Bulk-Upload-Template-COMPLETED-EXAMPLE.xlsm\" target=\"_blank\">IC Bulk Upload Template COMPLETED EXAMPLE<\/a><\/p>\n<p>~ Great Time Saver ~<strong><br \/>\n<\/strong>~ Helpful (Essential) Guide Attached ~<\/p>\n<p>When applying for E-rate funding for Internal Connections, the Form 471 requires every component to be listed on its own FRN Line Item, followed by a detailed listing of which entities will be using the equipment and how much funding should be allocated from their respective Category 2 budgets to pay for the equipment.\u00a0 Creating these FRNs can be time consuming, as many of you have discovered over the last four years.\u00a0 To help alleviate this burden, USAC has created off-line Templates that can be completed and then uploaded into the Funding Request instead of manually creating\/adding FRN Line Items.\u00a0 While Templates are available for all C1 and C2 service types, the Internal Connections Template is the one I believe will save PA applicants the most time and will be most-used.\u00a0 The Internal Connections template has not been changed for FY 2020, and the correct version to use is V19.0 (attached). All of the bulk upload templates are available at:\u00a0\u00a0<a href=\"https:\/\/www.usac.org\/e-rate\/applicant-process\/applying-for-discounts\/fcc-form-471-filing\/\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/www.usac.org\/e-rate\/applicant-process\/applying-for-discounts\/fcc-form-471-filing\/&amp;source=gmail&amp;ust=1582049300620000&amp;usg=AFQjCNHHdSq4z8H8Z5270EeweSSSZqPsyw\">https:\/\/www.usac.org\/e-rate\/applicant-process\/applying-for-discounts\/fcc-form-471-filing\/<\/a>.<\/p>\n<p><strong>Bulk Upload\/Template Guide<\/strong><\/p>\n<p>To assist applicants with completing the Internal Connections Template and Bulk Upload process, I\u2019ve created the attached Guide which I strongly encourage you follow as you complete your first Template.\u00a0 Also attached is a completed Example Template so you can see what yours should look like.<\/p>\n<p><strong>What Are the Basic Steps for Using the IC Bulk Upload Process?<\/strong><\/p>\n<p>Applicants will create the off-line Template, validate for errors, then save to their hard drive when no errors are showing.\u00a0 Then they will create the Form 471 and funding request in EPC.\u00a0 At the FRN Line Item screen, click \u201cBulk Upload\u201d instead of Add FRN Line Item, and upload the Template. \u00a0EPC will then create a task within 1 minute with the Bulk Upload results.\u00a0 Applicants should review all of the FRN Line Item data that was imported to ensure accuracy.\u00a0 All data can be revised at this point, or applicants can delete the FRN Line Item information, and upload a revised Template if they so choose.<\/p>\n<p><strong>Advantages to the Using IC Bulk Upload Template?<\/strong><\/p>\n<ul>\n<li>Allows you to doublecheck your calculations<\/li>\n<li>Copy\/paste from another spreadsheet<\/li>\n<li>Assists with keeping track of school building C2 pre-discount budgets<\/li>\n<li>Saves time<\/li>\n<li>Can create the template after bids have been opened but before the contract is signed<\/li>\n<\/ul>\n<p><strong>Challenges to Using the IC Bulk Upload Template?<\/strong><\/p>\n<ul>\n<li>Template contains sensitive macros that restricts choices<\/li>\n<li>Must be sure to \u201cvalidate\u201d for errors prior to uploading<\/li>\n<li>HINT:\u00a0 When making a modification to a line, the Column A \u201creference number\u201d will reset.\u00a0 But it\u2019s easy to fix.\u00a0 Simply highlight the column, right click, then \u201cClear Contents\u201d and the numbers will return to normal.<\/li>\n<\/ul>\n<p><strong>What Information is Required on the Template?<\/strong><\/p>\n<p>The Template has 3 tabs \u2013 Equipment\/Pricing Tab, Recipients of Service Tab and List of Errors Tab.\u00a0 The first two tabs must be completed with basically all of the same FRN Line Item Data that would be required on the Form 471 itself, and the third tab shows what errors have been found in the data.\u00a0 Here is a list of what will be required:<\/p>\n<ul>\n<li>Category (Wireless data distribution, data protection, cabling, etc.)<\/li>\n<li>Manufacturer<\/li>\n<li>Model #<\/li>\n<li>Unit price (eligible and ineligible)<\/li>\n<li>Quantity<\/li>\n<li>Recipients of Service<\/li>\n<li>Amount per Model # (component) per Recipient of Service<\/li>\n<\/ul>\n<p>The Bulk Upload process is very simple if your Template has been completed accurately.\u00a0 Follow the attached Guide and you shouldn\u2019t have any problems completing and validating the Template.\u00a0 If you have any questions, please don\u2019t hesitate to contact me!<\/p>\n<p>Happy Templating!<\/p>\n<p>&#8212; Julie<\/p>\n<p>Julie Tritt Schell<br \/>\nPennsylvania E-rate Coordinator<br \/>\n717-730-7133 &#8211; o<br \/>\n<a href=\"mailto:jtschell@comcast.net\">jtschell@comcast.net<\/a><br \/>\n<a href=\"http:\/\/www.e-ratepaorg.local\/\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=http:\/\/www.e-ratepaorg.local\/&amp;source=gmail&amp;ust=1582049300620000&amp;usg=AFQjCNHMR8_HKialW7hp1Xhss--51V60kw\">www.e-ratepa.org<\/a><\/p>\n\n<div class=\"twitter-share\"><a href=\"https:\/\/twitter.com\/intent\/tweet?via=eratepenn\" class=\"twitter-share-button\" data-size=\"large\">Tweet<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>February 10, 2020<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[52],"tags":[],"class_list":["post-32213","post","type-post","status-publish","format-standard","hentry","category-listserve_archive"],"_links":{"self":[{"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/posts\/32213","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=32213"}],"version-history":[{"count":0,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/posts\/32213\/revisions"}],"wp:attachment":[{"href":"https:\/\/e-ratepa.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=32213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=32213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=32213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}