{"id":8011,"date":"2015-06-06T22:23:48","date_gmt":"2015-06-06T22:23:48","guid":{"rendered":"http:\/\/e-ratepaorg.local\/?p=8011"},"modified":"2015-06-06T22:24:16","modified_gmt":"2015-06-06T22:24:16","slug":"category-2-e-rate-purchasing-guide-strings-attached","status":"publish","type":"post","link":"https:\/\/e-ratepa.org\/?p=8011","title":{"rendered":"Category 2 E-rate-Purchasing Guide &#8211; Strings Attached"},"content":{"rendered":"<p><strong>\u00a0<\/strong>June 5, 2015<\/p>\n<p>Several PA applicants have received their FY 2015 Category 2 E-rate Funding Commitment Letters (FCDLs) and many more will be receiving theirs in the coming weeks.\u00a0 Congratulations!\u00a0 Although it would be nice to think that receiving the E-rate FCDL is the last step, I want everyone to remember that there are &#8220;E-rate Strings Attached.&#8221;\u00a0 This message is intended to provide you with the information you need to successfully purchase\/document your C2 equipment and to be fully E-rate compliant. \u00a0Information related to purchasing equipment BEFORE receiving E-rate funding is listed at the bottom of this message.<\/p>\n<p><strong>Purchase Orders<\/strong><\/p>\n<p>After you receive your E-rate FCDL, the next step is for you to issue the Purchase Orders to the approved vendors as follows:<\/p>\n<p>1)\u00a0 Issue a separate PO for each E-rate funding request.<\/p>\n<p>2)\u00a0 The PO should list the exact equipment\/quantities that were approved on the Form 471 application.\u00a0 If you are purchasing from the PEPPM contract, you should have your vendor provide you &#8211; on vendor letterhead &#8211; with a list of equipment parts (including make and model #) and quantities that you can attach to your PO.\u00a0 (Note:\u00a0 The Form 471 requires you to assign quantities and components to each specific school building.\u00a0 Although this level of detail is <strong>not<\/strong> required for your vendor price quote or PO, it is certainly an option if you prefer).<\/p>\n<p>3)\u00a0 On your Purchase Order, list the following (this assumes you want discounted billing):<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 General Description of Equipment (i.e. Ruckus Wireless)<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Vendor Name:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Funding Year 2015<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Form 471 #:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Funding Request #:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Total Cost of Equipment:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 E-rate Discount:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 E-rate Discounted Amount:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 District Share (this will be your PO amount):<\/p>\n<p>&nbsp;<\/p>\n<p>For example, if the full cost of the equipment is $100,000, and your discount is 40%, you would list 40,000 as the E-rate Discounted Amount, and $60,000 as the District Share.\u00a0 Obviously, this only applies if you want discounted billing.\u00a0 If you want to pay the vendor for the full cost and then seek reimbursement from USAC, you would just list the PO amount as the total cost, not the non-discounted amount.<\/p>\n<p><strong><em>\u00a0\u00a0\u00a0 Notes:\u00a0 <\/em><\/strong><\/p>\n<p>a)\u00a0 If you are purchasing other equipment that is NOT part of your approved funding, do not include this equipment on your E-rate PO.\u00a0 Create a separate PO for non-E-rate funded equipment.<\/p>\n<p>b)\u00a0 If you are purchase equipment that is PARTIALLY E-rate eligible, be sure to include that calculation in your PO to account for the full district share of the ineligible cost.<\/p>\n<p><strong>Submitting the Form 486<\/strong><\/p>\n<p>After the PO has been sent to the vendor, the applicant should submit the Form 486 to USAC to &#8220;turn on funding&#8221; which will allow invoices to be submitted for payment.\u00a0 Generally, the Service Start Date (SSD) should be the PO date.\u00a0 The exception to this is if you&#8217;re filing before July 1, you must list July 1 as the SSD because the system won&#8217;t permit a date prior to July 1 to be listed.\u00a0 For a full Form 486 guide, see:\u00a0 <a href=\"https:\/\/e-ratepa.org\/?p=7901\">https:\/\/e-ratepa.org\/?p=7901<\/a>.\u00a0 USAC will mail you a Form 486 Approval Letter about a week after the Form 486 has been submitted; the vendor will receive a copy of this 486 notification.<\/p>\n<p><strong>Invoicing USAC<\/strong><\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 If you received discounted bills, the VENDOR will submit the Form 474 (SPI) invoice to USAC and the school is not responsible for submitting any further forms to USAC.\u00a0 The only responsibility is for the district to ensure that the vendor&#8217;s invoice to the district is accurate.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 If you paid for the full cost of the equipment and did NOT receive discounted bills, then the SCHOOL should submit the Form 472 BEAR to USAC.\u00a0 This should be done after the equipment has arrived (or installed, if installation was included in the FRN), after the Form 486 Approval Letter has been received, and after you have paid the vendor invoice.<\/p>\n<p><strong>Documentation &#8211; After the Equipment Arrives<\/strong><\/p>\n<p>It is extremely important that you take the following steps to document and label your equipment because future E-rate audits will require such documentation to be provided\/shown:<\/p>\n<p>1)\u00a0 When the equipment arrives, label each piece of equipment with &#8220;FY 2015, FRN # <em>XXX<\/em>&#8221; listing the FRN number, of course. This is what the auditors will look for during their site visits.<\/p>\n<p>2)\u00a0 Record each piece of equipment in your school&#8217;s Asset (Inventory) Register or create your own E-rate Asset Register (recommended).\u00a0 The Asset Register should contain the following information:<\/p>\n<p>&nbsp;<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Make &amp; Model<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Serial number (if available)<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Physical location of equipment (building\/room number)<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Date installed<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Funding Year 2015 and FRN #<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Purchase Order #<\/p>\n<p>3)\u00a0 <a href=\"https:\/\/e-ratepa.org\/wp-content\/uploads\/2015\/04\/Asset-Register-Sample.xlsx\" class=\"mtli_attachment mtli_xlsx\" target=\"_blank\">Attached to this message <\/a>is the USAC Sample Asset Inventory Worksheet in an Excel file.\u00a0 You can see that it shows more than is required, but I think it&#8217;s very helpful to maintain such a detailed record of the payments and POs so that you can easily show this to the auditors.<\/p>\n<p><strong>Moving Equipment from Building to Building<\/strong><\/p>\n<p>Equipment MUST stay at the location indicated on the Form 471 for a period of three years after the date of purchase.\u00a0 After that, the equipment can be transferred to other eligible entities.\u00a0 If a location closes within three years, equipment from that closed location can be transferred to another eligible entity, but USAC must be notified of such equipment transfers using the Form 500, and the Asset Inventory must be updated.\u00a0 After five years from the date of installation, equipment can be disposed of, sold, transferred, traded, etc. with no USAC notification required.\u00a0 If equipment is sold, no funding is required to be returned to USAC.<\/p>\n<p><strong>Equipment Substitutions<\/strong><\/p>\n<p>If you find that you need to make a change to the equipment list for which you have been approved, either due to clerical error on your Item 21, or because the vendor is now substituting a newer\/different model number, you can submit what USAC refers to as a &#8220;Service Substitution Request.&#8221;\u00a0 The Service Substitution must generally have the same functionality (i.e. data distribution, wireless distribution, cabling, etc).\u00a0 If the service substitution results in a change in the pre-discount price, the E-rate funding commitment will be adjusted to the lower cost (we expect there will be procedures announced to explain how to ensure that any reduction in cost can be attributed back to that school&#8217;s C2 budget).\u00a0\u00a0 The SS Request must include Billed Entity\/Contact\/471\/FRN information as well as a &#8220;From-To List&#8221; that details exactly what was approved (From List), and exactly what equipment you would like to substitute (To List).\u00a0 Applicants also must include the original commitment amount and the revised commitment amount, along with a specific SS certification.\u00a0 Complete details and instructions for submitting a Service Substitution Request can be found at:\u00a0 <a href=\"http:\/\/www.usac.org\/sl\/applicants\/before-youre-done\/service-substitutions.aspx\">http:\/\/www.usac.org\/sl\/applicants\/before-youre-done\/service-substitutions.aspx<\/a>.<\/p>\n<p><strong>Purchasing C2 Equipment Prior to Receiving Your FCDL<\/strong><\/p>\n<p>Starting with FY 2015, E-rate rules permit applicants to purchase Category 2 equipment as early as April 1 prior to the start of the funding year &#8212; even if they haven&#8217;t yet received their FCDLs.\u00a0 Obviously, you will only want to make these early purchases if they are NOT contingent on E-rate funding and you plan to pay for your equipment in full and seek E-rate reimbursement after your Funding Commitment Letter arrives.\u00a0 \u00a0The following reminders are just for Early Purchases prior to receipt of your FCDL:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Be sure your PO is for the FULL amount, not the non-discounted share.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The Form 486 cannot be submitted until AFTER the FCDL arrives.\u00a0 It should list July 1, 2015, not the PO date because the online Form 486 won&#8217;t accept a date earlier than July 1.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Don&#8217;t forget to submit the Form 486 and Form 472 BEAR to USAC once your FCDL arrives, and after you have paid your vendor invoice.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 If you purchase some of the equipment on an FRN <em>before<\/em> you receive your FCDL and some equipment <em>after<\/em> you receive your FCDL, you must continue with the same payment method for that entire funding request.\u00a0 Meaning, if you start using the BEAR reimbursement process for the FRN, you must continue paying in full and using the BEAR reimbursement process for all equipment on that FRN &#8212; you cannot use two different billing methods on a single FRN.<\/p>\n<p>If you have any questions, please don&#8217;t hesitate to contact me at <a href=\"mailto:jtschell@comcast.net\">jtschell@comcast.net<\/a>.<\/p>\n<p>&#8212; Julie<\/p>\n<p>Julie Tritt Schell<br \/>\nPA E-rate Coordinator<\/p>\n<p>717-730-7133 &#8211; o<br \/>\n717-730-9060 &#8211; f<br \/>\n<a href=\"mailto:jtschell@comcast.net\">jtschell@comcast.net<\/a><br \/>\n<a href=\"http:\/\/www.e-ratepaorg.local\">www.e-ratepa.org<\/a><\/p>\n<p>penn*link<\/p>\n\n<div class=\"twitter-share\"><a href=\"https:\/\/twitter.com\/intent\/tweet?via=eratepenn\" class=\"twitter-share-button\" data-size=\"large\">Tweet<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>June 5, 2015<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[52],"tags":[],"class_list":["post-8011","post","type-post","status-publish","format-standard","hentry","category-listserve_archive"],"_links":{"self":[{"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/posts\/8011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8011"}],"version-history":[{"count":0,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=\/wp\/v2\/posts\/8011\/revisions"}],"wp:attachment":[{"href":"https:\/\/e-ratepa.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8011"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8011"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/e-ratepa.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}