Form 471 Filing Tips – C1, C2 and General
March 16, 2021
~ 10 days until filing deadline ~
Congratulations to the 519 PA entities that have filed Form 471s thus far! Of the 978 FRNs submitted, 365 are already in “Wave Ready” status. The deadline to file is Thursday, March 25 – only 10 days away. If you haven’t yet submitted your 471(s), please don’t wait. To help with your filings, I’ve taken your great questions and compiled these helpful filing tips, organized into 3 sections – Category 1, Category 2, and General. At the bottom are direct links to the Guides. Please let me know if you have any questions or if I can provide assistance in any way!
CATEGORY 1 FILING HINTS
1. For Category 1 FRNs, Answer the Yes/No Questions This Way:
- Internet Line Item = No/Yes
- WAN Line Item = Yes/No
2. Creating FRN Line Items – Breaking Out Circuit Costs
After you’ve created your FRN, don’t forget that you then must create the FRN Line Item(s) to actually describe the services/equipment and specify the amount of funding requested by circuit or component. How to find the FRN Line Item Page? There are multiple ways, and they’re easier to find this year than in previous years. Simply click on “Manage FRN Line Items” from the main FRN page or at the end of the FRN creation section. You can also click on the blue FRN number and that will take you to the FRN Line Items Page. Continue adding Line Items for that FRN until you’ve built your FRN. For example, if you’re requesting funding a Lit Fiber WAN, if you have 1 – 10 GB connection, 6 – 1 GB connections, and taxes, you will have 1 FRN with 3 FRN Line Items, identifying the unique speed, costs and recipients of each Line Item; and the total taxes for the entire service.
3. Handing Contract Amendments in EPC
Unfortunately, there’s no way to modify or add additional documents to your existing Contract Record in EPC. If you amended your contract (perhaps to upgrade bandwidth), PIA may reach out to you to ask why the requested services/amounts are different than what are contained in your original contract in which case you’ll simply send them the contract amendment. Do not create a new contract record simply because a contract was amended.
4. Have Written Documentation if Extending a Contract
If you have a contract that includes voluntary extensions, and you are exercising one of those extensions for FY 2021, be sure to have something in writing to or with the service provider. This can be as simple as an e-mail to the service provider indicating that you intend to exercise one of the extensions in your contract, pursuant to the terms of the original contract. PIA will see that your Contract Expiration Date is a year later than last year and will require you to submit proof that you extended the contract. Such documentation to or with the service provider must be dated on or before the date you submitted your Form 471. It’s also a good idea to mention in the FRN Narrative box that you are extending the contract. There is no way to upload this with your original Contract Record and you should not create a new Contract Record.
5. Have Documentation of Taxes/Surcharges
If your invoices include vendor taxes/surcharges, be sure to include those amounts on a separate FRN Line Item. PIA is asking for proof of those amounts again this year, so be prepared to provide a copy of a vendor invoice or contract that shows these amounts. If you have signed a new contract with a vendor and don’t yet know the taxes/fees, REQUIRE YOUR SERVICE PROVIDER TO PROVIDE YOU WITH THIS INFORMATION. For most transport services, vendors charge the 5.25% PA Gross Receipts Tax (at a minimum), and many also charge the Universal Service Fee (currently 31.8%). Most Internet invoices do not include taxes/surcharges.
6. Don’t Select Month-to-Month if You Have a Contract
When creating a FRN, the form asks if you’re purchasing from a contract, month-to-month (MTM) or tariff. In this case, MTM doesn’t mean that you’re paying vendors on a monthly basis. It means that you don’t have a contract with a vendor. All Category 2 FRNs must have contracts, and most Category 1 FRNs now have contracts (many cable Internet or DSL services are MTM services with no contracts). Be sure to create your Contract Record in EPC prior to starting the 471, then select Contract when you get to this question on the FRN. The system will then ask you to link to the appropriate Contract Record for the services or equipment in that FRN.
CATEGORY 2 FILING HINTS
7. Remove These Ineligible Items
Often, equipment is eligible, but some of the components/features are not. Here are a few of the most commonly overlooked ineligible items that you should be sure to remove from your Form 471 funding request, or list as ineligible:
Firewalls: Only the actual appliance and basic software are eligible. Anti-virus, anti-spam, filtering, and DDOS features/software are not eligible and must be removed or cost-allocated. If it’s a bundled package, your vendor should provide you with the accurate eligibility percentage.
UPSs: Network Cards are not eligible and must be removed from your funding request. Also, don’t forget that only eligible equipment may be connected to the UPSs.
8. Vendor Cost Allocation Links: Some manufacturers have websites to help applicants determine if the products they’re listed on their Form 471s are 100% E-rate eligible, partially eligible, or 0% eligible. Those websites have been compiled here: https://secaerate.net/Applicant-Resources.
9. No Requirement to Identify Equipment by Buildings: Although the Form 471 asks who the Recipients of Service are for each FRN Line Item, this is no longer a requirement. Simply answer “Yes” – all entities are receiving the equipment, and then click Continue.
10. Category 2 Budget Tool in EPC: This tool was not accurate or useful in previous years, but it works beginning with FY 2021 and is a great resource to ensure that you’re not requesting more than your Category 2 budget allows.
11. Multi-Year Product Licenses Eligibility Product licenses are E-rate eligible and should be requested as Internal Connections on the 471. The full cost of a multi-year license may be requested upfront in the year it will be purchased. List licenses under the subcategory of “license” and not the type of equipment it’s a license for. In other words, if it’s a wireless controller license, select ‘License’ and not ‘Wireless Data Distribution’.
12. Basic Maintenance Services Are Not Considered Licenses
Be careful not to mistake maintenance (support) services as product licenses. Support SKUs must be requested under a separate Basic Maintenance of Internal Connections FRN. Also, E-rate rules do not permit the requesting of multi-year maintenance (support) services in a single year – these must be amortized and requested in the funding year for which the service covers.
13. Break Out All Components into Separate FRN Line Items – Including Switches
If your Category 2 request contains multiple components, you must create a separate FRN Line Item for each component (model), and then show the # of units and the cost per unit. For example, a common mistake applicants make is to request just a single FRN Line Item for switches, with a single SKU. Then during USAC invoicing, the invoices are denied because the individual components were not listed/approved on the Form 471. Also, it is no longer a requirement to list which equipment will be located in which building, so just check “All Buildings” when you come to that screen (USAC hasn’t had a chance to remove that section from the Form 471 yet).
14. Including Installation on Category 2 FRNs
Create an Internal Connections FRN and the FRN line items for the equipment being installed. Then create another FRN Line Item and for “Type of Internal Connection,” select > Miscellaneous > Installation from the drop-down options.
15. Have Structured Cabling Contracts be Single Priced
For structured cabling, try to have your vendor contracts be for a single price, by building – not broken down by widget. Then just create 1 FRN Line Item in the Form 471. Vendor invoices, therefore, also should have just a single price, not broken down by widget being installed. On the Form 471, create an Internal Connections FRN. Then create a single FRN Line Item and for “Type of Internal Connection,” select > Miscellaneous > Installation from the drop-down options. Then select the ‘Cabling’ for the Product Type > ‘Other’ for the Make > Type in name of the vendor contracted to do the installation > type “structured cabling installation” for the Model.
16. Use C2 Bulk Upload Tool for Large FRNs
When creating Internal Connections FRNs with multiple FRN Line Items, applicants can use a Bulk Upload feature where a Template is created off-line and then uploaded into the FRN. It’s a true lifesaver for some applications! For more details about the Bulk Upload feature and to view the Guide, see: https://e-ratepa.org/?p=33043.
17. Service Start Date Must Be 7/1/2021
The Service Start Date cannot be earlier than July 1. Equipment is allowed to be purchased on or after April 1, and vendor invoices also may be dated on or after April 1. But on the Form 471, where it asks for the Service Start Date, leave it populated to be 7/1/2021. Note: The Service Start Date is not the same as the Contract Award Date; the Contract Award Date is what you provide in the Contract Record as the date you signed the contract.
18. PIA Reviews for UPSs
During PIA review, applicants requesting UPSs will receive a series of PIA requests asking about what specific equipment will be plugged into each UPS in order to ensure that only E-rate eligible equipment can be attached. In order to be prepared with answers, please review the questions at: https://e-ratepa.org/?p=32332.
GENERAL FORM 471 FILING HINTS
19. Finding Contracts Records to Select After Clicking Search
When you create an FRN in the 471, the system asks if it’s based on a contracted service or MTM service. If you choose Contract, the system will ask which contract you want to associate with that FRN. If you forgot to create your Contract Record in the EPC Contract Module prior to starting the 471, no worries – add them now. In a separate tab, go to your Landing Page > Name of your District > Contracts > Manage Contracts > Add a Contract. Then create a Contract Record for each separate contract you have (both C1 and C2). Reminder, you’re not required to upload copies of your contracts, but I strongly suggest you do so because PIA will likely ask you for them anyway. If you use the Copy FRN feature, your contract will still be linked from last year and doesn’t need linked again. (For help creating Contract Records, see https://e-ratepa.org/?p=32998.)
20. Returning to the Main FRN Page (and stop adding FRN Line Items)
If you’re done adding FRN Line Items and wish to return to the Main FRN Page, instead of clicking on the “Add New FRN Line Item,” click on the “Save and Continue” button at the bottom right of the page. That will take you back to the Main FRN page where you will find all of the FRNs you’ve created. To get back into the FRN Line Item(s) for a single FRN, click on the blue FRN number (it’s hyperlinked) or check the box and select “Manage FRN Line Items”.
21. Getting Back Into the 471
If you click on something that takes you out of the 471, or if you deliberately leave the 471, it’s easy to return where you left off. Simply go to your EPC Landing Page by clicking on the USAC Logo, and then under “My Tasks” click on the appropriate “FCC Form 471 – #21xxxxxxxx {Nickname You Gave the Form}.”
22. Clicked on “Save and Share” and Lost My 471
Whenever possible, don’t click this button! The draft 471 is then taken from your EPC profile and a message is sent to all other “users” associated with the organization asking if they want to “accept the task.” Only ever use the “Save and Share” feature if you truly want to “pass the ball” to another user to finish or certify the application.
23. Changing/Updating Enrollment & NSLP Data
Although it’s too late up update your EPC Profile (the Admin Window closed on January 13), if you find that you forgot to update your data or found inaccuracies, you can still make corrections. After the 471 is submitted, submit a RAL Modification and follow the steps using this Guide: xxxxx.
24. How to Answer Questions on the Certification Page
Yes/No Questions: On the final Certification Page, there are two questions asking if you received any funds from a service provider or if a service provider has helped you locate funds. The answer to both of these questions should be NO. Essentially, they are asking if a service provider has waived any of your non-discounted amounts (your fair share), or given you funds to offset those amounts. Don’t be confused by the meaning of these questions or pause in anyway. The answers should always be NO. If a vendor does offer to waive your share or give you funds to cover it, cancel your contract with that vendor and go to the next lowest bid.
Technology Budget Question: The forms asks for “Total budgeted amount allocated to resources not eligible for E-rate support.” Here they want you to take your entire technology budget and subtract the amount you’re spending on E-rate purchases. In reality, if you enter the estimated amount of your technology budget, that’s fine. Just don’t list $0.
25. How to Locate PIA Inquiries After Receiving E-mail from PIA
Finding how to respond in EPC to a PIA inquiry can be a little challenging. The initial PIA reviewer’s e-mail will have a subject line that says “21xxxxxxx – E-rate Review Information” which doesn’t appear to be requesting information, but that’s exactly what it’s doing. First, log into EPC. Next, in the body of the message, click on the hyperlinked “Click here to respond to inquiries” which will take you into the EPC page where the Inquiry can be found. Then in the upper right corner of the page, click on “Respond to Inquiries”, and then the ‘Outreach Type’ will become an active hyperlink. The most common Outreach Types are: Eligibility of Products and Services, Requested Discount, Eligibility of Entities, and Category 2 Budget. Click on the Outreach Type and then proceed to answer the questions, upload the requested invoices, etc. Don’t click Submit until the entire Inquiry has been completed. If you need more time to respond, click “Request Extension” located at the top right corner of the page. A helpful PIA Review Guide can be found at: https://e-ratepa.org/?p=33101.
Topic-Related Guides and Additional Guidance:
- Bid Evaluations: https://e-ratepa.org/?p=32950
- Contract Guidance for E-rate Eligible Equipment/Services: https://e-ratepa.org/?p=32991
- Contract Records: https://e-ratepa.org/?p=32998
- Contract Records (PEPPM): https://e-ratepa.org/?p=33075
- Category 1 Filing Guide: https://e-ratepa.org/?p=33028
- Category 2 Filing Guide: https://e-ratepa.org/?p=33036
- Calculating Category 2 Budgets: https://e-ratepa.org/?p=32602
- Category 2 Bulk Upload Guide: https://e-ratepa.org/?p=33043
- Modifying/Canceling Form 471s: https://e-ratepa.org/?p=32266
- PIA Review Guide: https://e-ratepa.org/?p=33101
If you have any questions as you’re working through your Form 471, please don’t hesitate to e-mail me at jtschell@comcast.net.
Stay safe and healthy, my E-rate family!
— Julie
Julie Tritt Schell
Pennsylvania E-rate Coordinator
717-730-7133 – o